Road reconstruction and LATM treatments of Edgar Street, Glen Iris.

Specialised traffic calming techniques and re-design was used for the full length of roadway primarily for the high influx of population using the Harold Holt Swim Centre. Works involved the construction of 2,500m2 of concrete pavement, 2.4km of bluestone kerb and two pitcher channel, 8,500m2 of full depth road reconstruction and adopted a new stormwater drainage network through the road.

Thorough landscaping and raised pavement construction makes the newly constructed are well suited to the Stonnington district and aesthetically pleasing to the wider community who use the new road for various purposes.