Fercon were awarded the contracts to carry out Stages 1 & 2 of the construction of the Simms Road Oval Pavilion, on the banks of the Plenty River in Montmorency.
Featuring many ESD principles, as well as design protocols to suit the location of the pavilion within a flood zone, the building featured a suspended concrete slab on a steel sub-floor, Exotec cladding, and Kingspan insulated panel roofing. Roof mounted solar hot water collectors were also installed to minimise the amount of energy required to provide hot water to the pavilion.
The project was staged to allow the Montmorency Junior Football Club access to the change rooms, amenities and kitchen areas, whilst the social room and meeting room were constructed. Fercon worked in close consultation with Council and the football club to ensure that our Stage 2 construction works impacted the operations of the club as little as possible.