The City of Port Phillip awarded Fercon the contract to complete the structural remediation and refurbishment works to the Elwood Life Saving Club & Sails on the Bay building on the Elwood foreshore.

The works included the demolition and reinstatement of the external skin masonry wall. New stainless steel brick ties were retrofitted to the entire building, along with concealed steel supports to the first floor balcony balustrade. Fercon were heavily invovled in the development and implementation of the required temporary propping to the existing structure throughout the remediation works.

Along with the structural upgrade, Fercon also completed the repair of existing rafters and eave linings, replacement of existing rafter caps, and installation of new guttering. During the works to the Sails on the Bay section of the building, Fercon also completed the refurbishment of the function room toilets within a very tight timeframe, with great assistance from Sails on the Bay management, along with CoPP.